Heidelberg Material Skövde
July 2024 | We carry out various maintenance jobs at the stop
Heidelberg Material Brevik
July 2024 | We carry out various maintenance jobs at the stop
Glomfjord YaraJune 2024 | .We install 2 newgirthgear and a new shell on Yara's dryers.
Norcarb Malmö
May 2024 | We install a new gear and shell in stainless steel.
South Cell Mörrum
April 2024 | .We change the mantle and girthgear on MU1 and carry out various maintenance jobs on both ovens and peripheral equipment.
Scandinavian Kiln Service Workshop
We have now put up a welding test for 4 of our employees on Powder Arc Welding (SAW 121) in order to be able to broaden our offer to our customers.
Heidelberg Materials Kjöpsvik
January 2024 | Maintenance stop. We renovate, among other things, the large cement mill and gearboxes.
We are moving to new premisesAugust 2023 | As our service commitments have increased, we have now moved to new, larger premises that better suit our business. We are now located at Atlasgatan 9F.
Heidelberg Materials SliteAugust 2023 | Change of liners and the middlewall in cementmill n2
Heidelberg Materials SkövdeAugust 2023 | Kilnservice change 30 meters of the kilnshell
Yara Glomfjord ASJune 2023 | Yearly maintenance work and repairs on the dryers
Norcem KjöpsvikMarch 2023 | Yearly maintenance work
Norcem BrevikFebruary 2023 | Yearly maintenance work
Södra Cell Mönsterås
November 2022 | Kilnservice together with Valmet replace kilnshell and livering on limekiln 2
BillerudKorsnäs
September 2022 | Kilnservice delivers and installs a new mantle and girth gear on limekiln 3.
Yara Glomfjord AS
June 2022 | We change mill shell and live ring on dryer 2. An interesting and challenging job where we have to dismantle the entire outlet with associated outlet housing, screws, pumps, etc. to be able to cut the bad parts away and replace. We also install Kilnservice's own designed lamellar seal which reduces fuel costs.
Södra Cell Mörrum
April 2022 | Kilnservice changes the cooler on limekiln 2
Norcem Brevik
January 2022 | We carry out various maintenance work at the audit stop
Munksjö Aspa Bruk
October 2021 | Kilnservice manufactures and installs new flue gas ducts as well as various maintenance jobs on the kiln.
New project manager
From 2021-09-01 we have a new project manager. Henrik Öhrblad comes from Preem oil refinery where he had a similar role.
BillerudKorsnäs Gävle
September 2021 | Kilnservice delivers and installs a new kiln shell and live ring on MU2
SCA Obbola
September 2020 | Kilnservice, together with our partner Valmet, has been commissioned to deliver and install a completely new lime kiln with associated equipment. The assembly is expected to be completed in October 2021.
BillerudKorsnäs Gävle
August 2020 | Kilnservice delivers and installs new pinion gear and turns the girth gear on MU1. This secures the operation and means that investment in a new gear can be postponed for several years during normal operation and maintenance.
Södra Cell Värö
May 2020 | Kilnservice in collaboration with Valmet installs two new gearboxes for kiln operation as well as various maintenance work.
Norcem Brevik
March 2020 | Kilnservice perform various maintenance work.
Norcem Kjöpsvik
February 2020 |Kilnservice replaces the gearbox on cement mill 4.
Cementa AB Skövde
January 2020 | Kilnservice perform various maintenance jobs during the spring break.
Cementa AB Degerhamn
cktober 2019 | Kilnservice dismantles the old one and installs a new loading pipeline from the harbor up on silo 9 and 1
Södra Cell Mörrum
October 2019 | Kilnservice install 22m new kiln section, 1st heavy section with tyre, 2 new suport rollers and a brand new 2 stage cooler which is delivered by our partner Valmet.
Södra Cell Mönsterås
September 2019 | Kilnservice machiners liverings and suport rollers during operation at Södra Cell Mönsterås.
Nordic Carbide
August 2019 | Kilnservice replaces 160 meters of traverse rail.
Noralf Odda
June 2019 | Kilnservice manufactures and install 1st new mill section of 11 meters.
Yara Glomfjord AS
May 2019 | At Yara's maintenance stop, a live ring was moved and new guide blocks were installed. Our staff also welded cracks in 2 of the dryers.
Cementa Slite
March 2019 | We change the 28m kiln sections and reassemble the girth gear and live ring on kiln 7.
Norcem Brevik
February 2019 | We change the outlet seal on the kiln and carry out repairs on the cement mill 6.
Södra Cell Mörrum
October 2018 | We repair the compax coolers on both lime kilns and perform service and maintenance work.
BillerudKorsnäs Karlsborg, upgrade
August 2018 | We are installing a brand new outlet section on the kiln and installing new satellite coolers.
Yara Glomfjord AS
June 2018 | We manufacture and install 3 new mantle sections on the dryers and install our own designed lamella seal.
Valmet AB
May 2018 | We are installing a new girth gear on MU1 for BillerudKorsnäs Skärblacka.
Norcem Brevik
March 2018 | We replace all liners in chamber 2 and the outlet wall on mill 7.
Södra Cell Mörrum
November 2017 | We mount a new inlet on the MU1 and carry out maintenance work on the compax coolers.
BillerudKorsnäs Frövi
September 2017 | We are replacing 3 kiln shells with suport rings and installing a new compax cooler of Valmet design.
Yara Glomfjord Norway
June 2017 | We change mantle sections and suport ring on dryer 1.
Heidelberg cement group Skövde
May 2017 | Maintenance work during the factory's summer stop. We renovate crushes, expansions, cyclones and more.
Stora Enso Oulu Finland
May 2017 | We assemble and install new support rollers on foundation 3.
Södra Cell Värö
March 2017 | New service agreement with Södra Cell Värö regarding preventive maintenance on the lime kiln.
Finnsementti Pargas
March 2017 | We change 2 meters of the kiln and suport ring.
Norcem Brevik
February 2017 | We change 4 meters of kiln shell, change inlet end and replace all lining on cement mill 6.
Cementa Skövde
January 2017 | We install new separator, cyclone, bag filter and fan and associated ducts. Kilnservice also manufactures and installs new platforms and foundation steel for the new equipment.
Rottneros Vallvik
November 2016 | New service agreement with Rottneros Vallvik regarding preventive maintenance on the lime kiln.
Södra Cell Mönsterås
October, 2016 | We change the kiln section and the suport ring on the lime kiln 2 and perform other stop jobs on both lime kilns.
Stora Enso Skutskär
September, 2016 | We are installing 2 new kiln sections as well as 2 suport rings on lime kiln 2.
Norcem Brevik.
August, 2016 | We change lining on the inlet wall, chamber 1, middle wall and the outlet on the cement mill 7.
Yara Glomfjord
May 2016 | At Yara in Glomfjord we change shell sections on the drying drum and adjust the inlet section
Norcem Brevik
March 30, 2016 | At Norcem Brevik, we replace two kiln sections and reassemble the girth gear .
Vallviks Bruk
March 23, 2016 | We have been entrusted with changing the kiln sections and the girth gear during the fall 2016.
EN ISO 3834-2: 2005
March 15, 2016 | From today we are certified according to EN 3834-2 by Force Certification.
New economy responsible
From 2016-03-01 we have a new CFO. Anneli Westlund comes from Söderberg and Partners where she has held a similar position.
Norcem Kjöpsvik
Jan 8, 2016 | At the annual audit stop, a new partition wall and all inner lining plates were installed on cement mill 4.
New project engineer
From 2015-09-01 we have a new project engineer. Linus Kraft comes from Empower AB where he held the same position.
Korsnäs
Sep 1, 2015 | The kiln section and the suport ring were replaced on Korsnäs kiln No. 1 base 3
Skutskär
October 10, 2014 | At Stora Enso in Skutskär, a new pinion was mounted during the autumn stop .
Vallvik
October 10, 2014 | During the autumn stop, a new diesel motor was installed on Vallvik's lime kiln.
Selected partner
June 19, 2014 | When Valmet bought the lime kiln part from FLSmidth, an agreement was signed between Valmet and SKS that SKS provide service and maintenance of Valmet's lime kilns.
Cementa Slite
Supervision May 1, 2014 | Monitoring when changing the baseframe on foundation 1 and 20 m kiln section on kiln 7 in Slite.
Södra Cell Mörrum
April 1, 2014 | The girth gear was turned and a new pinion was mounted on Mörrum's lime kiln 1.
Korsnäsverken
October 23, 2013 | Kiln shell and suport ring were changed on Korsnäs kiln no. 3 foundation 3
Frövi
June 1, 2013 | Kiln shell and suport ring were changed on the lime kiln foundation 2.